
WHY THE FIRST 60 SECONDS MATTER
Most transfers seem routine, but that is where complacency kicks in. Everyone wants to get started and keep the day moving, but one extra minute up front can save a lot of time later, while also ensuring safety for everyone involved. Whether product moves by pump or nitrogen pressure, a quick walk-around can ensure a safe and quick transfer, done with few interruptions.
THE 60-SECOND WALK-AROUND
- RECEIVING CAPACITY: Confirm the tank has space for the planned quantity, including safe headspace once complete. Never fill vessels liquid full.
- LEVEL OR QUANTITY CHECK: Verify the sight gauge, flow meter, scale, or other reliable measuring method is working properly.
- PRODUCT PATH: Trace the line from the source to the receiving tank. Confirm the intended valves are open and unused outlets are closed and capped.
- HOSES AND CONNECTIONS: Inspect for damage, fully seat each connection, secure locking devices, and support hoses to prevent strain.
- EMERGENCY EQUIPMENT: Make sure eyewash water, safety showers, spill control materials, and emergency shutoffs are immediately accessible in the work area.
- TRANSFER CONTROL: A trained operator who can monitor the transfer continuously must be present during the entire transfer.

START SLOW AND VERIFY FLOW
START THE PUMP OR OPEN NITROGEN CONNECTIONS SLOWLY: Confirm product is moving into the intended tank, watch every connection for leakage, and verify the measured quantity or tank level responds as expected before increasing flow. The transfer must remain attended from start to finish.
PPE FOR LIQUID CONTACT POTENTIAL
The TELONE™ II by Teleos label identifies transfers as a task with liquid contact potential. Handlers performing the
transfer must wear, at minimum:

WHEN NITROGEN PUSHES THE PRODUCT

Nitrogen displaces oxygen. Use adequate ventilation, stay clear of tank openings while relieving pressure,
and never enter a nitrogen-padded vessel except under an approved confined-space entry procedure.
STOP THE TRANSFER IF:

Learn more about safe stewardship of TELONE™ by Teleos at www.teleosag.com/stewardship/. Remember, there’s no coming back from a poor start!
Disclaimer:
The resources and information provided are meant purely for educational discussion, contains only general information about legal matters, and is not to be construed as advice. Please note that any information or resources provided are not legal or regulatory advice, and should not be treated as such. You must not rely on the information provided as an alternative to legal advice from your attorney or other professional services. Teleos Ag encourages readers to consult with counsel, and their local, county, and state regulators. We make no representations or warranties, express or implied, in relation to the information provided through our resources and blog posts. It is the readers responsibility to know the laws related to 1,3- D, appropriate PPE, Licensing, etc., in his or her City, County, State, and Country.
- BEFORE YOU START THE TRANSFER: A 60-SECOND TELONE TRANSFER CHECK - September 14, 2026
- CYLINDER QUICK-CONNECT FITTING CARE: Proper Use & Care for 110-Gallon Pig Connections - August 12, 2026
- VALVING ON APPLICATION EQUIPMENT - June 15, 2026
